At Rectory Road, new foundations have been excavated and poured for both the rear toilet and main front extension. DPC blockwork has been installed, and the suspended beam and block floor structure are in place with external walls constructed. All roof construction works have been undertaken and are complete with roof coverings being installed to the rear toilet extension and felt and battening works underway on the front main extension. Suspended timber floor installation is due to follow.
Internally the new suspended chipboard flooring has been constructed with voids being cleared and insulation being installed. Studwork partitions have been formed, strengthened, and with boarding undertaken ready to receive plaster finishes. Loft hatches have been trimmed into position and all existing ceilings are currently being boarded ready for plaster finishes